







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Whittier, CA: What the Job Runs and What It Costs
Cabinets & countertops in Whittier typically run $14,000 – $45,000 for a full replacement of both, and most jobs take two to four weeks from demolition to final caulk. If you’re only swapping countertops, you’re looking at $2,000 – $6,500. If you’re refacing cabinets and keeping the boxes, expect $4,000 – $13,000. Call (888) 271-7872 for a free on-site estimate. We price the job in writing before anyone touches a screwdriver.
How a cabinet and countertop job actually runs, day by day

Most contractors hand you a color chart and disappear for three weeks. Here’s the sequence we actually run, and what you’ll be asked to decide at each stage.
Stage 1: Measure and layout (day 1, about 2 hours)
We template the existing footprint, check wall plumb and floor level, and photograph every shutoff and outlet. On Whittier homes from the 1950s and 1960s tract blocks, walls are rarely square, so we note where filler strips or scribe molding will absorb the difference. You decide the cabinet line and door style at this meeting. KraftMaid is our go-to for a reason: the box construction holds up and the finish warranty is real.
Stage 2: Demolition and prep (days 2 – 3)
Old cabinets and tops come out, and we cap or shut off the water and gas lines. This is where surprises surface: dry rot behind a sink, a missing stud, aluminum branch wiring from the 1960s. We photograph what we find and price any fix before proceeding. You decide whether to repair or expand scope here, not later.
Stage 3: Cabinet install (days 4 – 6)
Base and wall cabinets get set, shimmed, and fastened to studs, not just drywall. We level the run within 1/16 inch across the countertop surface because a slab will telegraph every high spot. You decide hardware placement and pull-outs at this stage, before the doors go on.
Stage 4: Countertop template and fabrication (days 7 – 14)
Stone and quartz get templated after cabinets are set, then fabricated off-site. Cambria takes roughly 7 – 10 business days from template to install in this market. Laminate or butcher block can be measured and cut faster, often within 3 – 5 days. You decide edge profile and overhang. Nothing gets drilled for a faucet until the slab is on the cabinets.
Stage 5: Set, plumbing, and punch (days 15 – 20)
The slab goes down, the sink and faucet get set, and we reconnect plumbing and check for leaks under pressure. You walk the job with us, we correct the punch list, and you get the 730-Day Done Right Promise in writing. If it’s not done right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll be choosing between, and what each one really costs you
- Stock vs. semi-custom cabinets. Stock boxes are the cheapest route and fit standard 3-inch increments. Semi-custom (KraftMaid’s line included) lets you hit odd ceiling heights and non-standard depths, which matters in older Whittier homes where a 30-inch base won’t land clean under a soffit.
- Quartz vs. granite. Quartz is non-porous and doesn’t need sealing; it handles the San Gabriel Valley heat cycling without staining. Granite is natural stone with variation no two slabs share, but it needs resealing every year or two and can cost more at the high end for a rare slab.
- Laminate. Still a legitimate choice at roughly a third of the stone price. It wears through at the sink edge over time, but it’s the honest answer when the budget is tight and the layout is right.
- Butcher block. Warm, repairable, and cheap to sand back to new. It needs oiling and it will show water rings if you’re careless. Good for islands, not for a main sink run.
- Refacing. Keeps the existing boxes, replaces the doors and veneer, and lands around $4,000 – $13,000. It only works if the boxes are solid. If the cabinet frames are particleboard from a 1980s remodel that got wet, refacing is money down a hole.
What Cabinets & Countertops costs in Whittier, CA

Our Whittier range for a full cabinet and countertop replacement is $14,000 – $45,000 depending on the kitchen size and the grade you pick. Here’s how the line items stack:
| Line item | Typical range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Kitchen island installation | $3,000 – $10,000 |
| Backsplash installation | $800 – $2,500 |
Five things push a job from the low end to the high end. Kitchen size is the biggest: a 10×10 galley sits near the bottom, an open 200-square-foot kitchen with an island goes to the top. Existing condition matters just as much. Rotted subfloor, old galvanized supply lines, or a wall that has to move for a bigger run adds real dollars. Relocating a sink or range means moving plumbing and a 240-volt circuit, and that pulls in a permit and a licensed trade. Material grade swings the cabinet number by thousands: a stock line vs. semi-custom KraftMaid is not a small gap. And structural changes, like knocking out a wall to open the kitchen, add framing and engineering.
A written estimate from us lists cabinets, tops, labor, demo, haul-away, plumbing reconnect, and permits as separate lines. It does not quietly include drywall repair from tile removal or appliance hookups unless we’ve priced them in and shown you. What you see is what you pay: no change orders on work we scoped wrong.
See the difference
Before
After
Before
After
Before
AfterWhat Whittier homes specifically do to this job
Whittier is a built-out, older first-ring suburb of LA, so nearly all our cabinet and countertop work here happens inside homes that were already standing, often for decades. In and around Uptown Whittier, the Craftsman and period-revival houses from the 1900s – 1930s bring real quirks: pier-and-beam floors that flex, walls that aren’t square, and occasionally knob-and-tube-era wiring behind the old cabinet run. Down in the postwar tract blocks of 90603, 90604, and 90605, the 1950s – 1960s kitchens have small galley footprints, low soffits, and aluminum branch wiring we have to plan around. We work all four Whittier ZIPs, 90601, 90604, 90606, and 90612, and the housing stock tells you what you’ll find. Uptown historic-district review matters more on exterior changes than interior cabinet work, but if your project touches a window or a porch as part of a wider scope, plan review adds time. The hot, dry summers and Santa Ana wind days also shape our schedule: we sequence fabrication to avoid leaving an open kitchen during a heat wave.
Serving Whittier, CA – Our Local Coverage Area
We serve Whittier and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Cabinets & Countertops in Whittier

Two to four weeks for a full replacement, with the cabinet set taking 3 – 5 days and the countertop fabrication adding 7 – 10 more. Stone and quartz need that template-to-install window because slabs are cut off-site. Cabinet-only or laminate jobs can finish in 7 – 10 days. Call (888) 271-7872 and we’ll give you a real schedule for your kitchen, not a generic number.
A like-for-like swap of cabinets and counters usually doesn’t need one, but moving plumbing, gas, or electrical does, and structural changes always do. We pull the permits that apply and pass the inspections, and we tell you upfront which parts of your job trigger review. If your scope grows into a full reconfiguration, it becomes part of a full Kitchen Remodeling in Whittier and we handle the permit set for that too.
Yes, and most of our Whittier jobs stay in the existing footprint. Keeping the sink and range where they are avoids plumbing and electrical relocation, which is the single biggest cost saver in the budget. If the layout is genuinely cramped, we’ll price the move so you can see the real number before you decide.
Full replacement runs $14,000 – $45,000; countertops alone run $2,000 – $6,500; cabinet installation runs $4,000 – $13,000. The spread comes down to kitchen size, existing condition, material grade, and whether anything moves. Call (888) 271-7872 for an exact quote. Estimates are free, and financing is 0% for 18 months with $1,000 off projects over $10,000.
Every cabinet and countertop job is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in residential construction, and it covers our installation, not just the manufacturer’s product warranty. We put it in writing. Technicians are background-checked and arrive in uniform.
If the kitchen work is part of a wider update, homeowners often pair this with Walk-In Showers & Shower Remodeling in Whittier or a Tub-to-Shower Conversion in Whittier while the dust is already up. Our Kitchen Remodeling service covers the broader scope when you want one contractor from foundation to finish line, and you can see the full range of what we do on our Whittier service-area page.
Get a free estimate on cabinets & countertops in Whittier
Call (888) 271-7872 and a live person answers, any hour, any day. We’ll set a time to walk your kitchen, measure the space, and talk through cabinet lines and countertop materials. You get a written, line-item estimate with upfront pricing and no surprises. Our technicians have up to 12 years of experience, and every job carries the 730-Day Done Right Promise.
Written by the team at Groundwork Construction Co.












