







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Citrus, CA: What the Job Really Involves
Cabinets & countertops in Citrus usually runs $14,000 – $45,000 for a full tear-out and replacement, and most jobs take three to five weeks from demo to final caulk. That number covers new cabinet boxes, a stone or quartz top, and the finish carpentry, electrical and plumbing work that comes with them. For a straight swap of doors, fronts and counters on sound boxes, expect less. Call (888) 271-7872 and we’ll walk your kitchen and give you a written number.
How We Run a Cabinet and Countertop Job in Citrus, Stage by Stage

Here’s the sequence we actually follow. The point of spelling it out is so you know when you need to make a decision and when you can step away.
Stage 1: Measure and layout (day 1, about 2 hours)
We template the existing run, check every wall for plumb and square, and note where the current boxes are shimmed or scribed to hide a crooked wall. Foothill houses almost never have level floors. You decide cabinet line, door style, finish and countertop material in this meeting or within the following week.
Stage 2: Demo and protect (days 2 – 3)
Old boxes, counters and backsplash come out, and we seal off the rest of the house with plastic and zip walls. If your counters are a solid surface, we cut the plumbing and cap it the same morning so you’re never without water overnight. You’ll want to empty the cabinets the night before; we don’t pack dishes.
Stage 3: Rough-in and repair (days 3 – 5)
This is where surprises live. We check the wall behind the boxes for water staining, open the electrical to confirm the circuit can carry a new disposal or dishwasher, and repair any drywall or plaster the demo exposed. If plumbing needs to move for a sink relocation, that happens now, before boxes go in. You approve any change before we proceed, in writing, with a price.
Stage 4: Cabinet set and counter template (days 5 – 7)
Boxes go in level, plumb and shimmed, and crown or light rail gets fitted. The counter fabricator templates the day the boxes are set, because the top has to be cut to the actual installed cabinet, not the drawing. Stone takes roughly 7 – 10 business days at the fabricator before install. You pick edge profile and sink cutout location in this window.
Stage 5: Counter install, plumbing and punch (days 14 – 21)
The top goes on in one day, then the sink, faucet, disposal and dishwasher reconnect, and the backsplash goes up if it’s in scope. We do a full walkthrough with you, list anything that needs touching up, and schedule the return trip. Final payment happens after you’ve signed off, not before.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make, and What Each One Costs You Later
The materials decision matters more than the brand name on the door. Here’s the honest version of each trade-off.
- Plywood-box vs. particleboard-box cabinets. Plywood holds screws better and survives a slow leak. Particleboard saves real money and is fine in dry interior walls; it swells and crumbles if a supply line drips behind it for a month. In a Citrus house with older plumbing, we lean plywood for the sink base at minimum.
- Quartz vs. granite vs. butcher block. Quartz is non-porous and needs no sealing, which suits a hot, dusty foothill kitchen. Granite is cheaper per square foot on remnants and takes heat better, but wants resealing every year or two. Butcher block is warm and cheap to install and will need oiling and occasional sanding.
- Full overlay vs. inset doors. Full overlay is the standard and hides imperfect boxes. Inset looks like furniture and costs meaningfully more because every opening has to be built to tight tolerance.
- Soft-close hardware. Worth the small upcharge, especially on a drawer bank that gets used twenty times a day.
- Undermount vs. drop-in sink. Undermount is easier to wipe and is what most buyers expect in this price band. It also requires a solid top, so it’s a no-go on laminate.
What Cabinets & Countertops Cost in Citrus, CA

A typical full replacement in Citrus lands between $14,000 and $45,000. Here’s how the line items break out so you can see where the money goes.
| Line item | Range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash (if included) | $800 – $2,500 |
| Island, if you’re adding one | $3,000 – $10,000 |
Five things push a job toward the top of that range. Cabinet footprint and box count is the biggest lever. Material grade is second: a stock line with a laminate top sits at the bottom, semi-custom with quartz sits in the middle, and a custom shop is the ceiling. Third is whether plumbing or electrical has to relocate, which triggers rough-in work and often a permit. Fourth is the condition we find behind the old boxes, especially water damage or a wall that isn’t square. Fifth is whether the top is a stone that needs a fabricator template and lead time versus a pre-fab slab.
Your written estimate will list cabinet line and box count, counter material and square footage, demo and haul-away, electrical and plumbing allowances, and the finish carpentry. What it won’t include unless we’ve talked about it: new appliances, new flooring, lighting changes, or moving a wall. We put the exclusions in the estimate so there are no arguments later.
See the difference
Before
After
Before
After
Before
AfterWhat Citrus Homes Do to This Job
Most of the housing in the 91702 ZIP is post-war 1950s and 1960s ranch and stucco tract, with scattered custom places on the sloped and terraced foothill lots that back against the San Gabriels. That matters here for a simple reason: kitchen walls in these homes were built before anyone worried about cabinet loading, so we often find 2×4 studs at 24 inches on center with no blocking behind the upper cabinet run. We add blocking, which is a half-day of work a newer build never needs.
The other local wrinkle is permitting. Citrus is unincorporated, so county building review governs additions and any work that moves a wall, a window or plumbing, which is a slower and more slope-and-drainage-conscious path than the flat-valley permitting in Azusa proper. A cabinet and countertop replacement that keeps the layout usually doesn’t trigger a permit. A sink relocation or a wall removal does, and we pull it. Wildfire-interface standards don’t govern interior cabinets, but they do shape how we detail anything on the exterior envelope we touch along the way, and Santa Ana season means we schedule dusty demo days around wind advisories so the house doesn’t fill with grit.
If the job is part of a full Kitchen Remodeling in Citrus scope, we sequence the cabinets ahead of the tile and paint so the other trades aren’t working around finished surfaces. Our Kitchen Remodeling service covers that wider coordination.
We cover the whole Citrus area, from the flat streets near the canyon mouth up the terraced lots. Homeowners often pair this work with Walk-In Showers & Shower Remodeling in Citrus or a Tub-to-Shower Conversion in Citrus when the budget is running across two rooms at once.
Serving Citrus, CA – Our Local Coverage Area
We serve Citrus and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Citrus

Three to five weeks from demo to final walkthrough, and the stone counter lead time is usually the longest single wait at about 7 – 10 business days. A doors-and-fronts swap with a new top can wrap in under two weeks. Call (888) 271-7872 for a schedule estimate on your specific kitchen.
No, if the layout stays put and the sink, gas line and outlets stay where they are. You need one the moment plumbing, gas or a wall moves. Because Citrus is unincorporated, that permit comes through county review rather than a city hall, and we pull it and pass the inspection as part of the job.
Yes, in the large majority of cases. We template the existing layout and build the new boxes to match the sink, disposal and outlet locations, so the only plumbing work is reconnecting the supply and drain under the sink. Moving a sink across the room is the thing that turns a simple job into a rough-in project.
$14,000 – $45,000 for a full replacement, with cabinet installation at $4,000 – $13,000 and countertop installation at $2,000 – $6,500 of that total. Your written quote holds that number; we don’t come back with a change order because a wall was out of square. Call (888) 271-7872 for an exact figure.
Our 730-Day Done Right Promise covers the installation for two full years – if something we installed isn’t right, we come back and make it right. Manufacturer coverage on the cabinets and counters rides on top of that. Your written warranty is part of the estimate package, not fine print handed over at the end.
Get a Written Number on Your Citrus Kitchen
We’ll come to your Citrus home, measure the actual run, look behind the current boxes and hand you a written estimate with the cabinet line, counter material and labor broken out. No pressure to sign that day. Calls are answered by a live person around the clock, and every technician who shows up is background-checked and in uniform. Call (888) 271-7872 to book your free on-site estimate. We’re glad to walk you through it.
Written by the team at Groundwork Construction Co.












