Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Garage Conversion ADU in Citrus, CA: What It Takes and What It Costs
A garage conversion ADU in Citrus typically runs $45,000 – $130,000 and takes 8 – 16 weeks from demolition to final inspection, depending on how much plumbing, electrical, and structural work the space needs. The job turns an existing attached or detached garage into a permitted, legal living unit: new insulation and drywall, a full bathroom, a kitchenette with a sink and range circuit, upgraded electrical service, and a climate system. Call (888) 271-7872 to schedule a free on-site estimate for your garage conversion ADU in Citrus.
How We Build a Garage Conversion ADU in Citrus, Start to Finish

Every garage conversion ADU has the same core stages. What changes is how much the existing garage fights you at each one. Here’s the real sequence.
Stage 1: Assessment and design (week 1 – 2)
We measure the slab, check the depth of the garage floor relative to the main house, and trace the electrical panel and any plumbing lines that could tie into the new unit. The homeowner decides here whether the bath and kitchenette share a wall with the main house utilities (cheapest) or sit at the opposite end (longer runs, more money). This is also when we settle interior layout and whether the garage door opening becomes a wall, a window, or a slider.
Stage 2: County plan review and permit (week 2 – 8)
Citrus is unincorporated, so the plan set goes to county building review rather than a city counter. Expect four to six weeks for a typical garage conversion, longer if the lot has slope or drainage issues that trigger additional review. We handle the submittal and respond to reviewer comments; you sign the design decisions, not the paperwork.
Stage 3: Demo and rough-in (week 1 – 3 of construction)
The slab gets leveled or a raised subfloor goes in, which is the single biggest hidden cost on a conversion because garages are pitched to drain. Old garage doors and hardware come out, framing goes up for the new bath and partition walls, and plumbing and electrical get roughed in. We check the main panel first: homes built in the 1950s and ’60s around here often need a service upgrade before the ADU can pass.
Stage 4: Insulation, drywall, and systems (week 3 – 7)
Insulation goes in, then rough inspection, then drywall and tape. A ductless mini-split handles the heating and cooling for most units; a ducted tie-in is possible if the main house system has capacity. Fire separation detailing between the garage-turned-ADU and the house is part of this stage and gets inspected.
Stage 5: Finishes, final inspection, and walkthrough (week 7 – 12)
Cabinets, counters, flooring, fixtures, paint, and the exterior work at the old door opening get finished, then final inspection, then a walkthrough with you before we call the job done. Because the whole project sits under our 730-Day Done Right Promise, anything that surfaces after you move a tenant in comes back to us, not to your credit card.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Make on a Citrus Garage Conversion ADU
Most of the budget lives in five decisions. Here’s what each one actually costs you in money and long-term hassle.
- Floor over the slab: Self-leveling concrete pour runs cheapest and holds up to kitchen traffic. A floating engineered floor over a vapor barrier feels warmer and hides minor slope, but adds cost and needs a moisture test first. Luxury vinyl plank is the middle path most Citrus homeowners pick.
- Bathroom layout: A full bath tucked against the shared house wall uses existing plumbing ties and saves thousands. A bath at the far end of the garage means a new drain line trenched through the slab, which adds real days and real dollars.
- HVAC approach: A ductless wall unit is the standard for a single-room ADU and easy to zone. A ducted tie-in works only if your existing system has headroom; otherwise you’re buying a second system anyway.
- Kitchenette grade: A sink, two-burner cooktop, and small refrigerator get you a legal unit at the low end. Full-height KraftMaid cabinetry and a proper range move it toward a rentable long-term space.
- Old garage door opening: Infill with framed wall and a window is the most affordable. A large slider or patio door costs more but changes how the unit lives.
What a Garage Conversion ADU Costs in Citrus, CA

Expect $45,000 – $130,000 for the full conversion, with most Citrus jobs landing in the $60,000 – $90,000 band. The floor is a clean, flat-slab retrofit with a shared-wall bath and a basic kitchenette. The ceiling is a conversion that needs a panel upgrade, a trenched drain line, a raised subfloor, a premium finish package, and any structural work at the old door opening. Every number below is the range we write into a line-item estimate, not a teaser price that changes later.
- Permits and plan review: varies by scope and county review; itemized in your written quote.
- Site and slab prep: leveling, vapor barrier, subfloor, insulation.
- Plumbing and electrical: bath rough-in, kitchenette circuits, mini-split, and panel work if the service is undersized.
- Drywall, paint, and finishes: flooring, cabinets and counters, fixtures.
- Exterior closure: wall at the old door opening, windows, and fire-rated detailing.
Variables that push a job to the top of the range: going full ADU with a kitchen rather than a single bath and sleeping area, moving plumbing to a far wall, adding an exterior entry and its own patio, upgrading the electrical service from an aging panel, and choosing premium finishes. What’s typically not in a conversion quote: detached-unit site work, a brand-new foundation, or landscaping around the new entry. If your project grows into something larger than a garage, it’s worth looking at the full scope on our Home Additions & ADU in Citrus page before you lock a budget. Upfront pricing means the number in the estimate is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat Citrus Homes Specifically Do to a Garage Conversion ADU
Citrus sits wedged against the San Gabriel Mountains in the 91702 ZIP, and the housing stock in the foothill streets shows it: post-war 1950s and ’60s ranch and stucco tract homes alongside scattered custom houses on sloped or terraced lots. Many garages here still have original electrical panels and single-pane windows, which routinely turns a “simple” conversion into a panel upgrade and a window swap. County building review governs the job, not city permitting, and the review group is stricter on slope, drainage, and defensible-space detailing than the flat-valley counters in nearby Azusa or Duarte. On the graded lots up toward the mountain edge, we plan drainage around the new unit before drywall ever goes up, because winter rain on a graded slope finds every weak seam. Santa Ana wind events make ember-resistant exterior materials a real consideration at the old garage door opening too. We cover all of Citrus and the surrounding foothill streets, and the local conditions are baked into the first site visit, not discovered mid-job.
Serving Citrus, CA – Our Local Coverage Area
We serve Citrus and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Garage Conversion ADU in Citrus

Plan on 8 – 16 weeks of construction once permits are issued, and add four to six weeks for county plan review before that. A clean slab with a shared-wall bath lands closer to eight; a panel upgrade or trenched drain pushes it toward the top. Call (888) 271-7872 for a schedule based on your actual garage.
Yes. A legal, rentable ADU requires permits, including electrical, plumbing, and a final inspection, and Citrus projects go through county building review rather than a city counter. Skipping that means a unit you can’t legally rent, finance, or sell as living space. We pull the permit and manage the inspection cycle.
Often yes, if the bath shares a wall with the main house plumbing and the old garage door opening is simply infilled. Keeping the bath on the shared wall is the single biggest savings on a Citrus conversion. When the layout forces a far-side bath, we trench the slab; that costs more but is routine.
The range is $45,000 – $130,000, with most jobs in the $60,000 – $90,000 band. Panel upgrades, a full kitchen versus a kitchenette, and premium finishes move you toward the top of the range. Call (888) 271-7872 for an exact line-item quote; the free estimate comes with no obligation.
Every conversion we build is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If something isn’t right during that window, we make it right. Ask about the warranty terms in writing at your estimate.
Get a Free Estimate for Your Garage Conversion ADU in Citrus
Call (888) 271-7872 for a free on-site estimate. A live person answers, day or night. We’ll walk your garage, check the panel, trace the plumbing ties, and hand you a written line-item quote with the scope spelled out. If your project grows into a wider remodel, our Home Additions & ADU service covers that, and homeowners often pair a converted unit with a finished kitchen in the main house via Cabinets & Countertops in Citrus or new flooring through Backsplash, Tile & Flooring in Citrus. From foundation to finish line, one contractor.
Written by the team at Groundwork Construction Co.