A Groundwork company - serving El Monte, CA
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Citrus, CA

Garage Conversion ADU in Citrus - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in El Monte
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Citrus, CA: What It Takes and What It Costs

A garage conversion ADU in Citrus typically runs $45,000 – $130,000 and takes 8 – 16 weeks from demolition to final inspection, depending on how much plumbing, electrical, and structural work the space needs. The job turns an existing attached or detached garage into a permitted, legal living unit: new insulation and drywall, a full bathroom, a kitchenette with a sink and range circuit, upgraded electrical service, and a climate system. Call (888) 271-7872 to schedule a free on-site estimate for your garage conversion ADU in Citrus.

Call (888) 271-7872

How We Build a Garage Conversion ADU in Citrus, Start to Finish

A second-story addition that matches the existing roofline

Every garage conversion ADU has the same core stages. What changes is how much the existing garage fights you at each one. Here’s the real sequence.

Stage 1: Assessment and design (week 1 – 2)

We measure the slab, check the depth of the garage floor relative to the main house, and trace the electrical panel and any plumbing lines that could tie into the new unit. The homeowner decides here whether the bath and kitchenette share a wall with the main house utilities (cheapest) or sit at the opposite end (longer runs, more money). This is also when we settle interior layout and whether the garage door opening becomes a wall, a window, or a slider.

Stage 2: County plan review and permit (week 2 – 8)

Citrus is unincorporated, so the plan set goes to county building review rather than a city counter. Expect four to six weeks for a typical garage conversion, longer if the lot has slope or drainage issues that trigger additional review. We handle the submittal and respond to reviewer comments; you sign the design decisions, not the paperwork.

Stage 3: Demo and rough-in (week 1 – 3 of construction)

The slab gets leveled or a raised subfloor goes in, which is the single biggest hidden cost on a conversion because garages are pitched to drain. Old garage doors and hardware come out, framing goes up for the new bath and partition walls, and plumbing and electrical get roughed in. We check the main panel first: homes built in the 1950s and ’60s around here often need a service upgrade before the ADU can pass.

Stage 4: Insulation, drywall, and systems (week 3 – 7)

Insulation goes in, then rough inspection, then drywall and tape. A ductless mini-split handles the heating and cooling for most units; a ducted tie-in is possible if the main house system has capacity. Fire separation detailing between the garage-turned-ADU and the house is part of this stage and gets inspected.

Stage 5: Finishes, final inspection, and walkthrough (week 7 – 12)

Cabinets, counters, flooring, fixtures, paint, and the exterior work at the old door opening get finished, then final inspection, then a walkthrough with you before we call the job done. Because the whole project sits under our 730-Day Done Right Promise, anything that surfaces after you move a tenant in comes back to us, not to your credit card.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Make on a Citrus Garage Conversion ADU

Most of the budget lives in five decisions. Here’s what each one actually costs you in money and long-term hassle.

  • Floor over the slab: Self-leveling concrete pour runs cheapest and holds up to kitchen traffic. A floating engineered floor over a vapor barrier feels warmer and hides minor slope, but adds cost and needs a moisture test first. Luxury vinyl plank is the middle path most Citrus homeowners pick.
  • Bathroom layout: A full bath tucked against the shared house wall uses existing plumbing ties and saves thousands. A bath at the far end of the garage means a new drain line trenched through the slab, which adds real days and real dollars.
  • HVAC approach: A ductless wall unit is the standard for a single-room ADU and easy to zone. A ducted tie-in works only if your existing system has headroom; otherwise you’re buying a second system anyway.
  • Kitchenette grade: A sink, two-burner cooktop, and small refrigerator get you a legal unit at the low end. Full-height KraftMaid cabinetry and a proper range move it toward a rentable long-term space.
  • Old garage door opening: Infill with framed wall and a window is the most affordable. A large slider or patio door costs more but changes how the unit lives.

What a Garage Conversion ADU Costs in Citrus, CA

A framer checking new wall framing on a home addition

Expect $45,000 – $130,000 for the full conversion, with most Citrus jobs landing in the $60,000 – $90,000 band. The floor is a clean, flat-slab retrofit with a shared-wall bath and a basic kitchenette. The ceiling is a conversion that needs a panel upgrade, a trenched drain line, a raised subfloor, a premium finish package, and any structural work at the old door opening. Every number below is the range we write into a line-item estimate, not a teaser price that changes later.

  • Permits and plan review: varies by scope and county review; itemized in your written quote.
  • Site and slab prep: leveling, vapor barrier, subfloor, insulation.
  • Plumbing and electrical: bath rough-in, kitchenette circuits, mini-split, and panel work if the service is undersized.
  • Drywall, paint, and finishes: flooring, cabinets and counters, fixtures.
  • Exterior closure: wall at the old door opening, windows, and fire-rated detailing.

Variables that push a job to the top of the range: going full ADU with a kitchen rather than a single bath and sleeping area, moving plumbing to a far wall, adding an exterior entry and its own patio, upgrading the electrical service from an aging panel, and choosing premium finishes. What’s typically not in a conversion quote: detached-unit site work, a brand-new foundation, or landscaping around the new entry. If your project grows into something larger than a garage, it’s worth looking at the full scope on our Home Additions & ADU in Citrus page before you lock a budget. Upfront pricing means the number in the estimate is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Citrus Homes Specifically Do to a Garage Conversion ADU

Citrus sits wedged against the San Gabriel Mountains in the 91702 ZIP, and the housing stock in the foothill streets shows it: post-war 1950s and ’60s ranch and stucco tract homes alongside scattered custom houses on sloped or terraced lots. Many garages here still have original electrical panels and single-pane windows, which routinely turns a “simple” conversion into a panel upgrade and a window swap. County building review governs the job, not city permitting, and the review group is stricter on slope, drainage, and defensible-space detailing than the flat-valley counters in nearby Azusa or Duarte. On the graded lots up toward the mountain edge, we plan drainage around the new unit before drywall ever goes up, because winter rain on a graded slope finds every weak seam. Santa Ana wind events make ember-resistant exterior materials a real consideration at the old garage door opening too. We cover all of Citrus and the surrounding foothill streets, and the local conditions are baked into the first site visit, not discovered mid-job.

Serving Citrus, CA – Our Local Coverage Area

We serve Citrus and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: Garage Conversion ADU in Citrus

A remodeled primary bathroom with a soaking tub and walk-in shower

Get a Free Estimate for Your Garage Conversion ADU in Citrus

Call (888) 271-7872 for a free on-site estimate. A live person answers, day or night. We’ll walk your garage, check the panel, trace the plumbing ties, and hand you a written line-item quote with the scope spelled out. If your project grows into a wider remodel, our Home Additions & ADU service covers that, and homeowners often pair a converted unit with a finished kitchen in the main house via Cabinets & Countertops in Citrus or new flooring through Backsplash, Tile & Flooring in Citrus. From foundation to finish line, one contractor.

Written by the team at Groundwork Construction Co.

Why Citrus Chooses Groundwork Construction Co. of El Monte

We set the standard for garage conversion ADU in Citrus.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Citrus

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Citrus Customers Say

Trusted by homeowners across Citrus and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new wood side gate with black hardwareA new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodelA new clay tile roofNew double-hung windows in a dining roomA new front yard fence with a matching gate

More services in Citrus

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in El Monte

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your El Monte team

A local vetted partner works across El Monte and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Citrus?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Citrus.

(888) 271-7872

Request a Free Estimate in Citrus

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch