Tub-to-Shower Conversion in Monrovia: Cost, Timeline, and What Actually Happens
Most tub-to-shower conversions in Monrovia run $3,500 to $10,000 and take two to four working days once the permit clears. We cut out the old tub, prep and waterproof the wet zone, run the drain on the new shower footprint, set the base and tile or panel walls, hang the glass, and pass inspection. For an exact number on your unit, call (888) 271-7872 and we’ll set a free on-site estimate.
Monrovia has a split housing stock, and it changes the job. Bungalows near Old Town and the flat grid off Myrtle carry 1920s plumbing and 30-inch alcoves; the hillside homes up toward Monrovia Canyon often hide original drain runs under raised floors. We scope the drain before we quote, not after demo.
How a Tub-to-Shower Conversion Actually Goes, Stage by Stage

Every conversion follows the same sequence. The durations below are honest working days, not calendar spin.
- Day 1, morning: protect and demo. We lay floor protection, pull the tub and surround, and remove drywall to the framing on the wet wall. You decide the shower footprint here: keep it a 30×60 alcove, or push to 36×60 if the plumbing wall allows.
- Day 1, afternoon: inspect and rough-in. That’s when we see what the tub hid – a rotted subfloor edge, a copper drain with a pinhole, or a valve with no shutoff. The drain moves from the tub’s overflow position to the shower’s center or offset. If the fixture moves more than a few inches, we bring in a permit amendment and a licensed plumber.
- Day 2: framing, blocking, and waterproofing. We frame a new curb, add blocking for grab bars and the valve escutcheon, and set the waterproof layer. Cement board and a brush-on waterproof membrane on the walls, a sloped mortar or foam pan with a pre-slope to the drain. This is the part you can’t fix later, so we inspect it before tile goes on.
- Day 3: base, tile or panels, fixtures. You’ve already picked the material set. Porcelain tile runs slower than a solid-surface panel system by about a day. We set the base, tile or panel the walls, install the valve trim, head, and hand shower.
- Day 3 to 4: glass and inspection. Tempered glass goes up after the base is fully cured, we silicone and seal, then we walk the inspection with your Monrovia inspector. Final clean and you’re showering that night.
Two decisions drive the timeline: whether the drain moves (that’s where a two-day job turns into four) and material grade. Solid-surface panel systems are the fastest and easiest to keep clean; tile with a proper membrane takes longer but holds up to the hard foothill water and gives you a custom grout-line look. Our technicians have up to 12 years of experience on this exact scope, so the framing and waterproofing stage doesn’t get rushed.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Be Choosing Between for a Tub-to-Shower Conversion
- Shower base material. Acrylic bases run $250 to $600 installed and clean up in a minute. A tiled mortar bed, $900 to $1,800, gives you a walk-in curbless look and lasts decades if it’s waterproofed right. The trade-off is cure time and grout line maintenance.
- Wall finish. Solid-surface panels (Kohler and similar) install fast, have no grout to scrub, and suit a household that wants zero upkeep. Porcelain tile costs more per square foot and adds a day, but a 12×24 porcelain will look identical in 20 years if the membrane holds.
- Glass and enclosure. Semi-frameless is the sweet spot, around $700 to $1,400 installed. A frameless 3/8-inch panel adds $400 to $700 and looks custom; a shower curtain rod and no glass saves $1,000 but blocks the light in a small alcove.
- Valve and showerhead. A pressure-balanced valve is the default and fine. Thermostatic valves add $200 to $400 and prevent the hot-cold jolt when a washer kicks on – worth it in older homes with shared plumbing.
- Grab bars and handheld. Worth deciding now because blocking goes in during framing. A 36-inch bar and handheld slide costs $150 to $400 and turns the shower into something usable for the whole household as people age.
You’ll also decide whether to pair this with the wider scope. If the vanity, floor, or lighting needs attention too, it’s often cleaner to plan it as a Bathroom Remodeling in Monrovia rather than add jobs piecemeal later.
What Tub-to-Shower Conversion Costs in Monrovia, CA

Plan on $3,500 to $10,000 for a tub-to-shower conversion in Monrovia, with the typical job landing near $5,500 to $7,000 for a standard 30×60 alcove with tile and a semi-frameless glass door. Five variables push the number up or down from there.
| Line item | Low | High |
|---|---|---|
| Demo, haul-off, subfloor patch | $400 | $900 |
| Drain move and rough-in | $250 | $1,200 |
| Framing, blocking, waterproofing | $600 | $1,400 |
| Shower base | $250 | $1,800 |
| Wall tile or panel finish | $700 | $2,400 |
| Valve trim, head, handheld | $250 | $900 |
| Glass enclosure | $700 | $1,400 |
| Permit and inspection | $150 | $450 |
The variables that decide low versus high end: how far the drain and valve move, whether water damage under the old tub is found, the grade of tile versus panel, glass style, and whether your Monrovia permit is a simple fixture swap or a drain-relocation scope. Every estimate from us is written line-item and fixed – the number you see is the number you pay, no change orders for what we should have caught during the walk-through.
See the difference
Before
After
Before
After
Before
AfterWhat Monrovia Homes Specifically Do to This Tub-to-Shower Conversion
Monrovia’s permitting reality drives the schedule on half the jobs we see in 91016. Inside Old Town and along Myrtle Avenue’s historic core, exterior and structural changes carry design review, so conversions that alter the footprint or bump a wall can take weeks to clear – while a drain-in-place alcove swap stays on a short fixture-and-inspection path. On the flat grid, that means the bungalows built in the 1920s often need the drain reworked because the original tub sat on a cast iron drain with corroded fittings; we replace it while the wall is open rather than wait for it to fail behind new tile. Up in the foothills, the slope lots above the ‘L’ street line mean hillside and canyon-mouth access, tighter parking, and occasionally a raised-floor bathroom where the drain runs under a crawl rather than a slab. We schedule those jobs around the block’s parking and haul-off timing, and we scope the crawler space before we quote. Whatever gets built, we stay within the scope your permit allows and bring it back to inspection-ready condition before sign-off.
If you’re already thinking about the rest of the house while the tile setter is there, some homeowners pair this with a roof or exterior project – we also handle Metal Roofing in Monrovia and Tile Roofing in Monrovia when the same permit window is open.
Serving Monrovia, CA – Our Local Coverage Area
We serve Monrovia and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Tub-to-Shower Conversion in Monrovia

Two to four working days for a standard alcove, counted from demo to final inspection, once the permit is issued and materials are on site. A drain relocation or a full tile job pushes toward four; a pre-fab panel and base can finish in two. Call (888) 271-7872 for a firm schedule based on your bathroom.
Yes – a permit is standard when the work touches the drain, the waterproofing, or the valve, which almost every conversion does. A straight fixture swap with no plumbing or layout change may qualify for a lighter permit; we confirm the scope with the city before we schedule. We pull the permits and pass the inspections as part of the job, and the cost shows up as a line item on your estimate.
Often yes, and that’s the lowest-cost path at $3,500 to $5,500. If we keep the drain within a few inches of the old tub’s overflow and don’t move the wet wall, there’s no rough-in work and no structural change. It only gets complicated when the layout moves – a wider shower or a walk-in with no curb – which typically adds $800 to $2,000 depending on how far the drain and valve must travel.
Between $3,500 and $10,000, with most jobs near $5,500 to $7,000 for a standard alcove with tile and a semi-frameless glass door. Drain relocation, water-damage repair, and material grade are the biggest movers. Call our team at (888) 271-7872 for an exact written quote – the estimate is free and it’s line-item, so you see every component.
Every conversion we do is backed by the 730-Day Done Right Promise – if it isn’t done right, we make it right, for two full years. That covers our workmanship on the framing, waterproofing, and tile, which is where conversions actually fail. Manufacturer warranties on Kohler fixtures and glass stand alongside it.
Get a Free Tub-to-Shower Conversion Estimate in Monrovia
Call (888) 271-7872 to schedule a free on-site estimate for your tub-to-shower conversion in Monrovia. We measure the actual alcove, check the drain and valve locations, and ask about the rest of your bathroom so we’re honest about whether a standalone conversion or our Bathroom Remodeling service is the smarter spend. You’ll leave the call with a written, line-item quote and a real timeline – no change orders, no surprises. We serve homeowners throughout Monrovia and the San Gabriel Valley, and calls are answered by a live person 24/7.
Written by the team at Groundwork Construction Co.